Products / Immersed UF Modules
Immersed UF Retrofit Assessment
A project assessment for membrane replacement within an existing tank.
Engineering service
Request specifications
SELECTION DATA
Technical and procurement details
- Listing or scope
- Engineering service
- Selection input
- Provide bay drawings, installed module list, measured flux, TMP trend and lifting method.
Published figures describe the named catalog listing. Ask for the current model datasheet, reference test conditions and an approved installation drawing when specifying a project.
PROJECT FIT
What to send with an enquiry
Provide bay drawings, installed module list, measured flux, TMP trend and lifting method.
- Review water levels, filtrate headers, module lift paths and chemical isolation before detailed design.
- Include existing drawings, the operating schedule and the location of the equipment.
- List the requested acceptance documentation and the planned commissioning window.
NEXT STEPS